MEPCO Steam Trap Head Assembly: For Mepco Dunham Bush, 40-515G/44-515A
The MEPCO Steam Trap Head Assembly is a float and thermostatic repair kit designed for Mepco Dunham Bush steam traps. It is compatible with the 40-515 series, including model numbers 40-515G and 44-515A, and replaces…
SKU 3G-OTH-69426
Also listed as: ML 9634 · ML-9634
Local availability & support
- Delivery
- Worldwide DHL shipping from Singapore; 7–14 business days door-to-door for most destinations.
- Payment
- Invoicing in USD. Bank transfer (SWIFT) and corporate PO accepted.
Need installation or engineering help?
Ask a question
Product Description
The MEPCO Steam Trap Head Assembly is a float and thermostatic repair kit designed for Mepco Dunham Bush steam traps. It is compatible with the 40-515 series, including model numbers 40-515G and 44-515A, and replaces manufacturer part number ML9634. This assembly is intended for use with trap bodies 405Y58 and 405Z12.
Frequently Asked Questions
What is the MEPCO Steam Trap Head Assembly used for?
The MEPCO Steam Trap Head Assembly is a float and thermostatic repair kit used to replace the internal mechanism of Mepco Dunham Bush steam traps. It is designed for industrial steam systems to efficiently remove condensate and air while preventing steam loss, commonly applied in process heating and HVAC applications.
What are the specifications of the MEPCO Steam Trap Head Assembly?
This MEPCO Steam Trap Head Assembly is compatible with the 40-515 series, including models 40-515G and 44-515A. It replaces manufacturer part number ML9634 and is intended for use with trap bodies 405Y58 and 405Z12. The product type is a float and thermostatic repair kit.
Where to buy the MEPCO Steam Trap Head Assembly worldwide?
You can source the MEPCO Steam Trap Head Assembly through 3G Electric, a global industrial equipment distributor. We handle full logistics, customs clearance, and delivery to worldwide destinations. Contact us for availability and lead time; we supply genuine MEPCO components for steam trap maintenance.
How to install the MEPCO Steam Trap Head Assembly?
To install the MEPCO Steam Trap Head Assembly, first isolate the steam trap and depressurize the system. Remove the trap cover and existing internals, then insert the new head assembly, ensuring proper alignment with the body. Reassemble the cover and test for leaks. Always follow manufacturer guidelines for safe installation.
Used in
Common applications for MEPCOMEPCO Products
3G Electric supplies MEPCO float & thermostatic repair kits. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
