We ship worldwide — Singapore, Australia, Malaysia, Indonesia, Philippines, India, Middle East & more

Image not available
SupcoSequencers

Supco Q113 Electric Sequencer, 2 Switches, 24V AC, 7A @ 240V, 10-30 sec Main On

The Supco Electric Sequencer: 1 Timings (MPN Q113) is a 24V AC sequencer with 2 switches rated at 7 A @ 240V. It features a main on timing range of 10 sec to 30 sec, as specified by the manufacturer.

SKU 3G-OTH-67548

Also listed as: Q 113 · Q-113

Brand
Supco
Item
Q113 Electric Sequencer, 2 Switches, 24V AC, 7A @ 240V, 10-30 sec Main On
Category
Sequencers
Available to Order
Trade pricing by quote — replies within 24h
Qty
WhatsApp an engineerMessage via Telegram
No account needed — your quote request goes straight to our engineers. A free account lets you track quotes and re-order faster.
Worldwide Shipping
Air & sea freight
Datasheet on Request
Technical specs
1-Day Quote
Replies within 24h

Local availability & support

Delivery
Worldwide DHL shipping from Singapore; 7–14 business days door-to-door for most destinations.
Payment
Invoicing in USD. Bank transfer (SWIFT) and corporate PO accepted.

Technical Specifications

Supco
Manufacturer Part Number
Q113
Type
7 A @ 240V
AC
24V
Main On
10 sec to 30 sec
Voltage
24V AC
Switches
2

Technical Documents

No technical documents available for this product.
Request documentation
Not sure this is the right part? Get a recommendation.

Need installation or engineering help?

Installation, commissioning, maintenance plans, system design, and bundled product + service quotes — one team handles the full scope.
Talk to an engineer

Ask a question

Supco Products
3G Electric (S) Pte. Ltd. — Singapore

Product Description

The Supco Electric Sequencer: 1 Timings (MPN Q113) is a 24V AC sequencer with 2 switches rated at 7 A @ 240V. It features a main on timing range of 10 sec to 30 sec, as specified by the manufacturer.

Frequently Asked Questions

What is the Supco Q113 electric sequencer used for?

The Supco Q113 electric sequencer is used in HVAC and refrigeration systems to stage electric heating elements or other loads in a timed sequence. It ensures that multiple circuits energize one after another, preventing large inrush currents and protecting system components.

What are the specifications of the Supco Q113 sequencer?

The Supco Q113 sequencer operates on 24V AC and has 2 switches rated at 7 A @ 240V. Its main-on timing range is 10 sec to 30 sec. This model is designed for precise staging control in heating and cooling equipment.

Where to buy the Supco Q113 sequencer worldwide?

3G Electric supplies the Supco Q113 sequencer to customers worldwide. We handle full logistics, customs clearance, and delivery to your site. Contact us for a quote and lead time; we source genuine Supco parts for global industrial and HVAC applications.

How to install the Supco Q113 electric sequencer?

Install the Supco Q113 sequencer by mounting it securely in the control panel, connecting the 24V AC control voltage to the coil terminals, and wiring the load circuits through the normally open switch contacts. Follow the manufacturer's wiring diagram and ensure all connections are torqued to specification.

Used in

Common applications for Supco
Commercial refrigeration display cases — Supco RO82 relay and CSS-25U starter for compressor motor control without run capacitors
Medium-load HVAC systems — Supco SPP 6/SPP 8 hard-start devices to reduce compressor inrush current and extend motor lifespan
Cold-chain pharmaceutical and food storage — SL300TH temperature–humidity data logger for continuous monitoring and regulatory documentation
Refrigerant service operations — Piercing valves and perforator cocks in 1/2" and 5/8" sizes for fast, non-invasive line access
Compressor thermal management — Universal Compressor Door for reducing shell temperature and improving efficiency in hot ambient conditions
Retrofit and field repairs — Supco controls with Quick Connect terminals for rapid installation in legacy refrigeration circuits

Supco Products

3G Electric supplies Supco sequencers. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.

You might also need

Burners & Combustion Pumps & Compressors Spare Parts All Products

Compatible alternatives & equivalents

Cross-referenced by specification & description
This sequencer operates on 24V AC and features 2 switches. It is rated at 14 A at 120V and 7 A at 240V, with a main on timing adjustable from 1 to 20 seconds. Used in HVAC systems to sequence electric heating elements or other loads, ensuring staged activation and preventing large inrush currents
WHITE-RODGERS
This sequencer operates on 24V AC and features 2 switches. It is rated at 14 A at 120V and 7 A at 240V, with a main on timing adjustable from 1 to 20 seconds. Used in HVAC systems to sequence electric heating elements or other loads, ensuring staged activation and preventing large inrush currents
This sequencer operates on 24V AC and features 2 switches rated at 10 A @ 120V and 7 A @ 240V. The main-on timing is adjustable from 1 second to 20 seconds. It is used in HVAC and industrial control panels to stage loads such as heating elements or compressors, delaying switch activation to reduce inrush current
This sequencer operates on 24V AC and features 2 switches rated at 10 A @ 120V and 7 A @ 240V. The main-on timing is adjustable from 1 second to 20 seconds. It is used in HVAC and industrial control panels to stage loads such as heating elements or compressors, delaying switch activation to reduce inrush current
Sequencer operating at 24V AC with a single switch. Main on timing adjustable from 1 second to 25 seconds. Rated 10 A at 120V and 7 A at 240V. Used in HVAC, burner control, and process automation for timed sequencing of electrical loads
Sequencer operating at 24V AC with a single switch. Main on timing adjustable from 1 second to 25 seconds. Rated 10 A at 120V and 7 A at 240V. Used in HVAC, burner control, and process automation for timed sequencing of electrical loads
This electric sequencer operates on 24V AC and features 1 switch with a main-on timing range of 1 to 20 seconds. It is rated 10 A at 120V and 7 A at 240V. Used in HVAC, burner control, and process automation to stage equipment start-up and prevent simultaneous inrush current
This electric sequencer operates on 24V AC and features 1 switch with a main-on timing range of 1 to 20 seconds. It is rated 10 A at 120V and 7 A at 240V. Used in HVAC, burner control, and process automation to stage equipment start-up and prevent simultaneous inrush current
This electric sequencer operates at 24V AC and features 2 timings with 4 switches. It is rated for 10 A at 120V and 7 A at 240V. Used to control the order and timing of multiple electrical loads in HVAC and industrial equipment, it stages operation to prevent inrush current spikes
This electric sequencer operates at 24V AC and features 2 timings with 4 switches. It is rated for 10 A at 120V and 7 A at 240V. Used to control the order and timing of multiple electrical loads in HVAC and industrial equipment, it stages operation to prevent inrush current spikes
This electric sequencer provides three timing intervals and three switches for staged control of multiple electrical loads. It operates at 24V AC and is rated 10 A at 120V and 7 A at 240V. Used in HVAC and industrial control systems to sequence heating elements, motors, or other loads, preventing inrush current spikes
This electric sequencer provides three timing intervals and three switches for staged control of multiple electrical loads. It operates at 24V AC and is rated 10 A at 120V and 7 A at 240V. Used in HVAC and industrial control systems to sequence heating elements, motors, or other loads, preventing inrush current spikes

More from Supco

View all Supco parts
The Supco Q105 is an electric sequencer operating at 24V AC with 2 timing intervals and 3 switches. It is rated 14 A at 120V and 7 A at 240V. Used in HVAC systems to stage electric heating elements or other loads in a timed sequence, preventing power surges and managing load distribution
Supco
The Supco Q105 is an electric sequencer operating at 24V AC with 2 timing intervals and 3 switches. It is rated 14 A at 120V and 7 A at 240V. Used in HVAC systems to stage electric heating elements or other loads in a timed sequence, preventing power surges and managing load distribution
Supco
Supco
The Supco Q112 is a 3-switch sequencer for HVAC and refrigeration systems, operating at 24V AC with a 7A rating at 240V. It sequences multiple loads such as heating elements or compressors, with a main-on timing adjustable from 10 to 30 seconds to prevent electrical overload