3G Electric
variant_2 | Subgroup: Gas trains
FBR

variant_2 | Subgroup: Gas trains

On RequestGas burners

Price on request — send us an enquiry for current pricing.

GAS/2 CE D1"1/4 S | Variant: variant_2 | Subgroup: Gas trains

Minimum order
3 units
Lead time
Worldwide DHL shipping from Singapore; 7–14 business days door-to-door for most destinations.
mailQuick enquiry

Technical specifications

stage2 stages
fuel typeGas
nozzle mm130
weight kg16
descriptionGas burners two stages.
fan motor w110
power kw max174
ip protectionIP 40
noisiness dba66-69
gas consumption3.5/7-17.4
electrical supply1
power supply info1N~230V
current absorption a0.77
thermal power mcal h30/60-150
nominal electric power w200
max combustion air temp c60

Frequently asked questions

Where can I buy the FBR GAS/2 two-stage gas burner?+

3G Electric supplies the FBR GAS/2 worldwide. As an authorised distributor, we handle logistics, customs clearance, and delivery to your facility. Lead time on request — contact our team for availability and pricing.

What is the thermal power output of the FBR GAS/2?+

The FBR GAS/2 delivers 30–150 mcal/h thermal power across two combustion stages. It operates on 1N~230V supply with a 110 W fan motor and achieves 66–69 dBA noise levels, suitable for mid-range industrial heating systems.

What is the electrical supply requirement for the FBR GAS/2?+

The FBR GAS/2 requires 1N~230V single-phase AC power with a current absorption of 0.77 A. The fan motor draws 110 W at nominal operation. IP 40 protection rating ensures suitability for indoor industrial combustion applications.

Enquire about variant_2 | Subgroup: Gas trains

Tell us your required quantity and delivery location — we reply within one business day.

More FBR products

All FBR productsarrow_forward

Related Gas burners

Browse all Gas burnersarrow_forward